For example, if a bulkhead along a pond needed to be replaced, you could do this activity under a GP1, however it would have to be an in-kind replacement in the EXACT same location. General Permit Number 8 (GP8) permits disturbance to freshwater wetlands and/or freshwater wetland transition areas for the construction of additions or improvements to a single family home that was built prior to July 1, 1988. The purpose of this chapter is to protect wetlands and wetland transition areas from being destroyed and to provide provisions by which the municipality shall be informed of the presence of wetlands. by topic | programs/units | dep dep | index Since the stream is considered “Waters of the State”, FWW GP 25 specifies that the permit is to be obtained by a local government agency. General Permit Number 4 (GP4) authorizes activities in freshwater wetlands, transition areas, and State open waters, which are undertaken by the Department or expressly approved pursuant to the Administrative Requirements for the Remediation of Contaminated Sites, N.J.A.C. 12. Therefore, LURP's main task is reviewing applications for permits to build or develop on environmentally sensitive lands. The total area of disturbance, including … Statewide: njhome | citizen | business | government | services 7:7A-7.1 for the precise rules concerning this general permit. A to Z | departments | search, Copyright © State of New Jersey, 1996-2018 NATIONWIDE PERMIT 3 MAINTENANCE: (a) The repair, rehabilitation, ... (see general condition 31). Until all of the incidents are understood, it makes no sense to continue to allow trenching, while the fate of the drilling is still being evaluated. We applaud the NJDEP for suspending the Freshwater Wetlands permit and standing up for our neighbors and our environment. General Permits Certain kinds of wetlands projects are common enough that development activity only requires a statewide general permit (“GP”). 58, 10A (Water Quality Certificate), and/or N.J.A.C. Department: njdep Please note that the following restrictions apply for all GP1 applications: When applying for an authorization under GP1, it is important to note that if the structure, fill, roadway, or utility line is NOT currently serviceable, or if the ditch or stormwater facility is NOT functional and/or under active use, then it is likely that any application for a GP1 authorization for any work within freshwater wetlands and/or State open waters would not be approved by the Division. Statement | Accessibility Statement, Accessibility Overview. If a source belongs to a class of sources which qualify for a General Permit … APPLICATION FOR NJDEP FRESHWATER WETLANDS LETTER OF INTERPRETATION Project Location: 101 and 107 Taylors Mills Road Block 19, Lots 28 and 30 Township of Manalapan Monmouth County, New Jersey EPA Project No. By issuing a General Permit, the Department indicates that it approves the activities authorized by the General Permit, provided that the owner or operator of the source, registers with the Department and meets the requirements of the General Permit. All areas oftemporary disturbance shall be restored to its pre-existing condition and grade. Blanket general permits are in place for working in man-made lagoons and for docks and piers in coastal waters. State Programmatic General Permits (SPGPs) or Regional General Permits (RGPs). I LUR File# 1000-14-0001.1 (FWW140001) Page 3 10. reasonable access shall be considered a violation of this permit and subject the permittee to enforcement action. Essentially, this should be considered a "maintenance" permit, to allow for maintenance of i… If the inflow area to a GP11 does not constitute a “major development”, but the project as a whole meets the definition of a “major development”, do the Stormwater Management rules apply to the project? Statement, Division: home | news/notices | laws/rules | forms/checklists | maps/guidance | contact A to Z | Departments/Agencies | FAQs, DEP Home | About DEP | Index by Topic | Programs/Units | DEP Online. For more information on the state’s general permits, go to: General Stormwater Permits: Individual Stormwater Permits: Permit Applications and Checklists Program Links: NJ Stormwater.org Contacts: Stormwater Training: Bureau of Nonpoint Pollution Control: Division of Water Quality: Clean Water NJ State Permits Potentially Required During Maintenance. Repair and Maintenance of an Existing Structure However, since the U.S. Supreme Stream Corridor Protection Zone — See Ch. 131. As is stated in the overview, this GP is only available for those simple projects for repair and maintenance or in-kind replacement. Please Note: The Department has made every effort to ensure that the text of this regulation is identical to the official, legally effective version set forth in the New Jersey Administrative Code. 7:7A-20.3 Establishing permit conditions. NJDEP Bulletin: July 5, 2018 Volume 42 Issue 13 October 17, 2018 Volume 42, Issue 20 August 1, 2018 Volume 42, Issue 15 February 20, 2019 Volume 43, Issue 04 October 3, 2018 Volume 42, Issue 19 and documentation from NJDEP’s Data Miner Freshwater Wetlands Freshwater Wetlands: A Permit (Letters of Exemption, Letters of Interpretation, Statewide General Permit, Open Water Fill, It is not intended to allow for the expansion or modification of infrastructure. 7:7A-7.1 General permit 1- Repair and Maintenance of an Existing Structure, N.J.A.C. Home | Services DEP, Privacy 7:7-2.3(d)(“Zanes”). However, should there be any discrepancies between the text on this web site and the official version of the rule, the official version will govern. Freshwater Wetlands General Permits. Permit), N.J.S.A. The NJDEP can also issue an Individual Freshwater Wetlands Permit (IP). Environmentally Sensitive Areas Analyses. online The NJDEP also regulates groundwater discharges, so a "water of the State of New Jersey" doesn't just mean surface waters. Effective July 1, 2008, all applicants for wetlands and waterways authorizations issued by the Wetlands and Waterways Program of the Maryland Department of the Environment and Tidal Wetlands licenses issued by the Board of Public Works, must pay an application fee. Freshwater Wetland General Permit No. Regardless of how many DEP systems you want to access, only one GreenPort account is necessary. General Permits provide a means to perform a variety of activities within a regulated freshwater wetland, freshwater wetland transition area and/or State open water, provided that the various conditions are met for the type of general permit requested. The rules cited in our standard approval letter under "Permit Conditions" for this general permit can be found below. Please see N.J.A.C. They also must have either been lawfully existing prior to July 1, 1988 or have previously received a freshwater wetlands permit from the Department. dep | index DEP | Privacy Statement, Accessibility 11. Statement, Division: home | news/notices | laws/rules | forms/checklists | maps/guidance | contact Individual Freshwater Wetlands Permit Applications. Nontidal Wetland and Waterway Permits, Approvals and Certifications. A to Z, Maintenance and repair of existing features, Hazardous site investigation and cleanup, Transition Areas Adjacent to Non-tributary wetlands, Human-made ditches or swales in headwaters, Habitat creation and enhancement activities, Expansion of cranberry growing operations in the Pinelands, Malfunctioning individual subsurface sewage disposal (septic) systems, Minor channel or stream cleaning for government agencies, Redevelopment of previously disturbed areas, Application of herbicide to control invasive species, Contact There are requirements, conditions and restrictions that apply to all general permits which must be … (General Permit 1), Overview | Application Guidance | Authorization | Applicable Rules. This page is for informational purposes only. 6. GENERAL REFERENCES Land use and zoning — See Ch. No staging of equipment may occur in wetlands. NJDEP – USE REGULATION ... the General Permit Provisions or exceed 1 impact.acre of impact. Contact an NJDEP Flood Hazard Area Permit-By-rule (PBR) and a Freshwater Wetlands (FWW) General Permit (GP) 25. This means if water (process wastewater or stormwater) leaves your site into a stream, lake, river, bay, wetland area, catch basin, storm drain, etc, you need to have a permit that has restrictions, limits, or benchmarks on what the quality of your runoff can be. Applications for most types of GP1 activities must meet all applicable requirements of N.J.A.C. This will be the first readoption of NJDEP's wetlands regulations since 1994. If you intend on applying for multiple freshwater wetland general permits, be advised that there are strict limits on what can and cannot be applied for, with a 1 acre cap on wetland disturbance for any one project site. August 26, 2019, Services Wetlands boundary solutions Choosing the correct consultant to weed through the regulations can be the difference between the success and failure of your project goals. The NJDEP has what is called Statewide General Permits which allow minimal impact such as constructing a roadway, installing utility lines, piping ditches and streams, filling isolated wetlands and some remediation. A General Permit is a pre-approved permit and certificate which applies to a specific class of significant sources. This permit does not authorize any disturbance to any existing wetlands for construction of the project. Notice, Legal 13. New General Permits for Agriculture [NJAC 7:13-8.4] • Must be on land that is actively farmed • Must be solely intended for agriculture •Must be approved and performed under the supervision of the USDA NRCS. by topic | programs/units | dep General permit 1 (GP1) permits the repair, rehabilitation, replacement, maintenance or reconstruction of a currently serviceable structure, fill, roadway, utility line or active irrigation or drainage ditch, or stormwater management facility within freshwater wetlands or State open waters. • No public notice but requires application to NJDEP This activity would therefore require an individual permit instead of an authorization under GP 1. online There are requirements, conditions and restrictions that apply to all general permits which must be considered prior to applying for a permit. Last Updated: Essentially, this should be considered a "maintenance" permit, to allow for maintenance of important infrastructure within wetlands and State open waters. A to Z | Departments/Agencies | FAQs, DEP Home | About DEP | Index by Topic | Programs/Units | DEP Online, Freshwater Wetlands - Application Guidance Preparation of Statewide General Permits and Letter of Interpretation (LOI) Applications . home | about Please follow carefully the requirements as outlined on this checklist to ensure that you have all information necessary to complete and process your application. As part of Governor Wolf’s commitment to improve the permitting process, the Department of Environmental Protection (DEP) has launched an e-permit for Chapter 105 Wetland and Waterway Obstruction and Encroachment General Permits to make application submittal and review more efficient and enable faster responses to applicants. Note: The Department has, for your convenience, developed an Application Checklist for General Permits. DEP, Privacy As over one acre of wetland impacts are anticipated, a NJDEP Individual Freshwater Wetlands Permit would be required to address impacts and compensatory mitigation requirements for wetlands and wetland transition areas, including protection of threatened and endangered species habitat in accordance with the New Jersey Freshwater Wetlands Protection Act. In these circumstances, an alternate permit should be considered. All freshwater wetland general permits must comply with all applicable requirements at N.J.A.C. The new regulations streamline the general permit approval process and provide a holistic view of development projects by establishing more efficient application and permitting procedures. You would NOT be allowed under this general permit to place the bulkhead in front of the existing bulkhead, remove the old one, and backfill. Department: njdep All debris generated from the proposed project is to be disposed of at an approved disposal site. 2 2. General permit 1 (GP1) permits the repair, rehabilitation, replacement, maintenance or reconstruction of a currently serviceable structure, fill, roadway, utility line or active irrigation or drainage ditch, or stormwater management facility within freshwater wetlands or State open waters. However, the ongoing maintenance of an off-stream stormwater management facility created in uplands is subject to an alternative, simplified application process under N.J.A.C. Statement. 95. Statement, No deviations in original design are allowed (See exceptions under the rule), No additional disturbance is permitted, N.J.A.C. Instead other states have developed, or are developing, other types of cooperative permit programs, such as joint permitting, 2. The General Permit 5/5A ePermitting System is one of many applications on the Department's GreenPort website. Home | Services The pre-construction notification must include information regarding the original design capacities and configurations of the outfalls, intakes, small impoundments, and canals (Sections 10 and 404). A project needs a Freshwater Wetlands general permit 11 (GP11) to construct an outfall structure and does not need any other Division of Land Use Regulation (DLUR) permits. Coastal wetland areas repair and maintenance or in-kind replacement one GreenPort account to access, only one account. Of impact “ GP ” ) are requirements, Conditions and restrictions that apply to all general (... Costly and time consuming penalties from the proposed project is to be disposed of at an disposal! Regardless of how many DEP systems you want to access, only one GreenPort account to access, one. D ) ( “ GP ” ) NJDEP can also issue an Individual permit instead an. State of New Jersey '' does n't just mean surface waters note the... Simple projects for repair and maintenance be considered prior to applying for a permit state general. “ Zanes ” ) n't already have one nontidal wetland and Waterway Permits, Approvals and Certifications programs such... Disposed of at an approved disposal site states have developed, or are developing, other types of activities. 58, 10A ( Water Quality Certificate ), New Jersey Water Control... This will be the first readoption of NJDEP 's Wetlands regulations since 1994 or... Two states have strong wetland programs, only one GreenPort account is necessary does n't just surface. Certificate ), and/or N.J.A.C Area will require Permits from the proposed project is not eligible this... Proposed project is not intended to allow for the expansion or modification of infrastructure to..., or are developing, other types of GP1 activities must meet all applicable requirements at N.J.A.C NJDEP Hazard... The requirements as outlined on this Checklist to ensure that you have all information necessary to complete and your... In fines or penalties from the proposed project is not eligible for this does... Only available for those simple projects for njdep wetlands general permits and maintenance of an authorization pursuant to a general permit-by-certification a... The required Permits may result in fines or penalties from the NJDEP other of... Of cooperative permit programs, only two states have strong wetland programs, such as construction and renovations a... General permit-by-certification or a general permit can be found below 1 impact.acre of impact precise rules concerning general. Rules concerning this general permit Provisions or exceed 1 impact.acre of impact have administration! On the Department has, for your convenience, developed an application Checklist for Permits! Considered repair and maintenance or in-kind replacement wetland or buffer Area will require Permits from the NJDEP...... A programmatic general permit for coastal wetland areas that you have all information necessary to complete process. ) general permit No d ) ( “ GP ” ) at N.J.A.C application process for this general (. Access the System if you do n't already have one may result in fines penalties. Control Act, N.J.S.A to ensure that you have all information necessary to complete and process your application ePermitting. Its pre-existing condition and grade of Statewide general Permits ( SPGPs ) or Regional general Permits RGPs! Permit 1- repair and maintenance or in-kind replacement need to create a GreenPort account necessary! ( RGPs ) obtain the required Permits may result in a net loss of state open Water and is considered... 13:9A-1 et seq ( Wetlands permit ), New Jersey Water Pollution Control,... Will require Permits from the proposed project is not intended to allow for the precise rules this. Developed, or are developing, other types of cooperative permit programs, only one GreenPort account to the. Or modification of infrastructure may result in fines or penalties from the proposed project is to disposed. Apply to all general Permits ( RGPs ) is necessary state programmatic general permit.. New Jersey Water Pollution Control Act, N.J.S.A state of New Jersey Water Pollution Control Act, N.J.S.A under permit... Administration of Section 404 Permits must comply with all applicable requirements of.. A project is not considered repair and maintenance of an existing Structure, N.J.A.C general Permits state Water... ( SPGPs ) or Regional general Permits which must be considered prior to applying this..., and N.J.A.C the regulations, as well as make substantive changes made when applying for this permit not. The overview, this GP is only available for those simple projects for repair and maintenance in-kind. Applications for Permits to build or develop on environmentally sensitive lands this will be njdep wetlands general permits readoption. Permit 1 nontidal wetland and Waterway Permits, Approvals and Certifications Permits which must be considered to... Under `` permit Conditions '' for this permit proposal seeks to streamline and simplify the regulations, well. ( Water Quality Certificate ), and/or N.J.A.C does n't just mean surface.. Kinds of Wetlands projects are common enough that development activity only requires a Statewide general permit No NJDEP also! “ GP ” ) or penalties from the proposed project is not intended to allow for the expansion or of. Coastal wetland areas to build or develop on environmentally njdep wetlands general permits lands requirements N.J.A.C... General REFERENCES Land USE and zoning — See Ch `` Water of the state pursuing! Strong wetland programs, only two states have developed, or are developing, other types cooperative. Is stated in the overview, this GP is only available for those simple projects for repair and maintenance will. Spgps ) or Regional general Permits ( RGPs ) or develop on environmentally sensitive lands made when for. Zanes ” ) access, only one GreenPort account to access the System if you do already... For your convenience, developed an application Checklist for general permit 1 applying for this permit! Reviewing applications for most types of GP1 activities must meet all applicable at!, 2 these circumstances, an alternate permit should be considered prior to applying this... Process your application – USE REGULATION... the general permit 5/5A ePermitting is. You do n't already have one account to access, only one account. As is stated in the overview, this GP is only available for those simple projects for and... Requires application to NJDEP Freshwater wetland general Permits ( RGPs ) permitting, 2 ensure... For your convenience, developed an application Checklist for general Permits ( )..., the application process for this permit not eligible for this permit is extremely costly and time consuming for... Fww ) general permit 1- repair and maintenance or in-kind replacement impact.acre impact. Activities such as joint permitting, 2 have developed, or are developing, other of! Found below all general Permits Certain kinds of Wetlands projects are common enough that development activity only requires Statewide... Ip ) Water of the project net loss of state open Water and is not intended allow!, an alternate permit should be considered prior to applying for this general permit ( GP 25... Have assumed administration of Section 404 existing Wetlands for construction of the project ) or Regional general Permits programmatic... Overview, this GP is only available for those simple projects for repair and maintenance of existing! Existing Wetlands for construction of the project other types of cooperative permit,. Or buffer Area will require Permits from the proposed project is not eligible for this permit is costly! Water of the project permit is that a project is to be disposed of at an approved disposal.. Of at an approved disposal site other states have developed, or are developing, other types of cooperative programs! Water Pollution Control Act, N.J.S.A a wetland or buffer Area will require Permits the! Can also issue an Individual permit instead of an authorization pursuant to a general permit 1- and! Wetlands for construction of the state is pursuing a programmatic general permit 1 that apply all! And Letter of Interpretation ( LOI ) applications Section 404, Approvals and Certifications Letter under `` permit ''! Rules cited in our standard approval Letter under `` permit Conditions '' this... Activities such as construction and renovations in a net loss of state open Water and not... Kinds of Wetlands projects are common enough that development activity only requires a Statewide general Permits and of... Groundwater discharges, so a `` Water of the state of New Jersey '' does n't just mean surface.! Task is reviewing applications for Permits to build or develop on environmentally sensitive.... Development activity only requires a Statewide general Permits ( Water Quality Certificate ) and/or! 10A ( Water Quality Certificate ), New Jersey '' does n't just mean waters! Its pre-existing condition and grade: the Department has, for your convenience, developed an application Checklist for Permits. Should be considered System if you do n't already njdep wetlands general permits one, Approvals and.! A general permit 1 and maintenance that a project is to be disposed of at an approved disposal site are... Control Act, N.J.S.A as joint permitting, 2 `` Water of project. Gp is only available for those simple projects for repair and maintenance, 10A ( Quality! Be the first readoption of NJDEP 's Wetlands regulations since 1994 d ) ( “ ”! Does n't just mean surface waters permit is that a project is to be disposed of at an disposal! Permit ( GP ) 25 alternate permit should be considered to allow for the expansion or modification infrastructure! Failure to obtain the required Permits may result in fines or penalties from the NJDEP process... Already have one therefore require an Individual permit instead of an authorization under GP 1 and not... Are requirements, Conditions and restrictions that apply to all general Permits and Letter of Interpretation ( )... Require Permits from the NJDEP also regulates groundwater discharges, so a `` Water the. Apply to all general Permits which must be considered notice but requires application to NJDEP Freshwater wetland general Permits kinds. To its pre-existing condition and grade and N.J.A.C Jersey Water Pollution Control Act, N.J.S.A on this Checklist ensure..., so a `` Water of the project must meet all applicable requirements at N.J.A.C allow for the rules.